Does Tegis schedule the annual inspections for us?
No. The periodic inspection is your authorized employees’ duty under 1910.147(c)(6). Tegis keeps the procedure current and the evidence exportable, so the inspection documents itself instead of being reconstructed from memory.
What does an auditor actually ask for?
The current procedure for a specific machine, its energy sources and verification steps, evidence of the periodic inspection, and training records. Tegis keeps the first three one click away per asset.
Can we export a whole site at once?
Yes, per asset. Export a set of per-asset PDFs for a line, a site, or the company when an audit or insurance review needs the packet.
How do shared steps affect our records?
Shared isolation points link across procedures. A change propagates to every affected record and the PDFs regenerate, so the trail stays consistent without manual reconciliation.
We are PSM-covered. Does this fit?
Yes. Process safety management under 1910.119 expects current process safety information, and LOTO records feed it. Tegis keeps the LOTO side current; it is not a PSM system and does not replace one.
What about procedures written years ago?
Bring the Word or PDF files. We help convert the priority set into structured procedures, so the record starts with real content instead of empty templates.