One LOTO standard across every plant, with no per-user fees

Every plant follows the same procedure format, and every technician, operator, and contractor scans for free. You see every site from one account and pull any machine’s PDF when an auditor asks.

  • One standard, every plant
  • Every shift scans free
  • Start with one line

Why manufacturing plants use Tegis

Every plant follows one standard

All sites use the same procedure format. Corporate EHS can review any plant, and each plant sees only its own equipment.

Equipment knowledge stays when people leave

Document every energy source, isolation point, stored-energy release, and verification step with photos while experienced technicians are there to explain them.

Changeovers do not outdate the procedure

When a line is retooled or a machine is moved, update its procedure once. The QR code on the machine opens the new version right away.

Built for the machines you run

Presses and stamping

Electrical, hydraulic, flywheel, and ram blocks.

Injection molding

Hydraulics, heater bands, and mold-close motion.

CNC machines

Spindle drives, coolant, hydraulics, and tool changers.

Conveyors and packaging

Every disconnect, belt tension, and air supply.

Robotic cells

Controller, servo brakes, arm gravity, and cell air.

Compressors and utilities

Shared units and every machine they feed.

Roll out one line at a time

Pick a pilot line

Choose the line where missing or outdated procedures create the most risk, usually high-maintenance or multi-energy equipment.

Convert its procedures

Bring existing Word files, PDFs, and technician knowledge into structured Tegis procedures.

Tag the equipment and brief the shift

Place QR codes at the assets and show workers how to confirm the equipment ID before using a procedure.

Start with one line in your plant.

Set up your plant

Common questions

Does this replace our LOTO binders?

Yes. Tegis becomes the system of record for machine-specific procedures. PDFs cover training, offline backup, and anywhere a printed copy is required.

Can we start with one plant and add more?

Yes. Procedures are organized by company and site, so you can start with one plant and add locations later.

We have dozens of identical machines. Do we write each one from scratch?

No. Duplicate a finished procedure for the sister machine, then check and update the equipment ID, location, and isolation points that differ before you approve it.

How does this help with OSHA 1910.147?

Procedures follow the structure the standard describes: scope, shutdown, isolation, lockout application, stored-energy release, verification, and restart. Tegis supports your energy control program; it does not replace your obligation to run one.

Can we import existing Word and PDF procedures?

Yes. Most plants start from existing documents and field knowledge. Ask about migration help during a demo.

Do technicians need an app or login to scan?

No. Scanning a QR code opens the procedure in a mobile browser. Your team controls who can write and approve.