Free lockout/tagout annual inspection form

Fill in the periodic inspection OSHA requires for every energy control procedure at least once a year. Add as many procedures as you need, then print them all with a log sheet, or print a blank form for the floor.

Periodic Inspection of Energy Control Procedure

29 CFR 1910.147(c)(6) · Complete at least once a year for each procedure

Equipment and procedure

Energy control method

Inspector

Must be an authorized employee other than the people using this procedure. (c)(6)(i)(A)

Employees included in the inspection

NameRoleResponsibilities reviewedRemove

Inspection checklist

Observe the procedure being used, or walk through it with the authorized employees.

ItemResultNotes
1. Procedure is written for this machine and is the current version (c)(4)(i)
2. Every energy source and its magnitude is listed (c)(4)(ii)
3. Shutdown steps were followed in the order written (d)(2)
4. Every energy-isolating device was located and operated as written (d)(3)
5. Each authorized employee applied their own lock or tag at every isolation point (d)(4)
6. Stored or residual energy was relieved, disconnected, or restrained (d)(5)
7. Isolation was verified before work began (d)(6)
8. Locks and tags are standardized, durable, and identify who applied them (c)(5)
9. Release steps were followed: area cleared, employees notified, devices removed by the person who applied them (e)
10. Each authorized employee could explain their responsibilities under this procedure (c)(6)(i)(C)

Findings and corrective action

Procedure needs revision
Retraining needed

Certification

I certify that I performed the periodic inspection of the energy control procedure listed above, as required by 29 CFR 1910.147(c)(6)(ii), on the date shown, with the employees listed.

Inspector signature
Date
Supervisor signature (optional)
Inspecting dozens of procedures every year?

Tegis keeps every machine’s procedure in one place, and annual inspection tracking is coming soon.

See LOTO audits and inspections →

What the annual inspection requires

Under 29 CFR 1910.147(c)(6), employers must inspect each energy control procedure at least once a year to confirm it’s being followed and still works. The inspection must:

  • Be performed by an authorized employee who isn’t using the procedure being inspected.
  • Correct any deviations or inadequacies it finds.
  • Include a review with each authorized employee of their responsibilities under the procedure.
  • For tagout procedures, also review affected employees’ responsibilities and the limits of tags.
  • Be certified with the equipment, the date, the employees included, and the inspector.

Read the full guide to lockout/tagout annual audit requirements. Need a procedure to inspect first? Use the free procedure template.

Frequently asked questions

How often does each procedure need an inspection?

At least once a year, for every energy control procedure. Procedures used less often still need a yearly inspection.

Who can perform the inspection?

An authorized employee other than the people using the procedure being inspected. It’s often a supervisor or a trained maintenance lead from another area.

Can one inspection cover several machines?

Only when they share the same procedure. OSHA allows a single procedure for a group of similar machines with the same energy sources and controls, and one inspection covers that procedure.

Can I fill in several procedures at once?

Yes. Add procedures one at a time or paste a list from a spreadsheet. Each new inspection starts with the same company, date, and inspector, and Print all puts every inspection on its own page behind a one-page inspection log.

What does the certification have to include?

The machine or equipment the procedure covers, the date of the inspection, the employees included in it, and the person who performed it.

Are my entries saved or uploaded?

Your entries stay in this browser so you can come back to them. Nothing is sent to Tegis. Print or save a PDF to keep a record.