No energy source gets skipped
Each source is a separate step, so a procedure cannot stop at the breaker while a line is still charged.
Every energy source gets its own isolation, release, and verification step, so a procedure never stops at the breaker. Contractors get the same current procedure by scan during turnarounds, at no extra cost.
Each source is a separate step, so a procedure cannot stop at the breaker while a line is still charged.
Bleed points, drains, and pass criteria get their own step instead of a sentence buried in a paragraph.
Share the QR-linked procedure during turnaround briefings under 1910.147(f)(2).
Type, magnitude, device, and check for each.
Bleed, drain, and release points spelled out.
Gauge reads zero. No flow. No motion.
Group method recorded; every worker keeps a lock.
The same procedure, shared by scan.
One edit updates every affected PDF.
Choose the unit with several energy sources on one skid, such as nitrogen, steam, and process chemicals.
Capture every isolation point, release device, and verification criterion with photos.
Link the QR code at the isolation point and use the same scan during turnaround briefings.
Tegis keeps your LOTO procedures current and exportable, which feeds process safety information. It is not a PSM system and does not replace one.
Yes. Stored-energy release is its own step with device, location, and pass criteria.
Hasp and lockbox device types are built in. Each worker applies and removes their own lock, and the step text documents the method.
Radiation is an energy type with its own unit, and custom isolation-device text covers hardware the standard options do not.
Convert the highest-risk units first. Old files become source material, not the system of record.