Safety resources

Plain-language lockout/tagout guides for EHS and maintenance teams, from OSHA 1910.147 basics to stored energy.

01 · Topic

Fundamentals

Start here: what LOTO is, when it applies, the six steps, and how energy control works.

3 articles
  1. What Is Lockout/Tagout (LOTO)? Definition and Why It Matters6 min read · Updated 2026-08-28
  2. When Is LOTO Required? Scope and Exemptions7 min read · Updated 2026-09-09
  3. The 6 Lockout/Tagout Steps and Zero-Energy Check7 min read · Updated 2026-09-09
02 · Topic

OSHA & compliance

What the standard requires, what inspectors write up, and how to train, inspect, and document it.

10 articles
  1. OSHA Lockout/Tagout Requirements (29 CFR 1910.147) Explained8 min read · Updated 2026-08-28
  2. Energy Control Procedures: What OSHA 1910.147(c)(4) Requires7 min read · Updated 2026-09-16
  3. Lockout/Tagout Annual Audit Requirements: What OSHA Expects6 min read · Updated 2026-08-28
  4. Authorized vs. Affected Employees: LOTO Roles and Training7 min read · Updated 2026-09-09
  5. LOTO Training Requirements: Roles, Retraining, and Records8 min read · Updated 2026-09-09
  6. OSHA LOTO Violations: Common Failures and Penalties7 min read · Updated 2026-09-09
  7. Lockout/Tagout Compliance Checklist (Program, Procedure, Field)5 min read · Updated 2026-08-28
  8. Build a Lockout/Tagout Program: Step-by-Step9 min read · Updated 2026-09-09
  9. Lockout Lock Removal: Employee Unavailable and Lost-Key Rules6 min read · Updated 2026-09-09
  10. Lockout/Tagout Toolbox Talk: 30-Minute Outline, Script, and Quiz6 min read · Updated 2026-09-09
03 · Topic

Procedures that work

Writing, coordinating, and hardening machine-specific procedures.

6 articles
  1. How to Write a Lockout/Tagout Procedure (Step-by-Step)8 min read · Updated 2026-08-28
  2. LOTO Devices and Hardware: Locks, Tags, and Hasps7 min read · Updated 2026-09-09
  3. Group Lockout/Tagout: Protecting Multiple Workers on One Machine7 min read · Updated 2026-09-09
  4. Contractor and Shift-Change LOTO: Keeping Protection Continuous7 min read · Updated 2026-09-09
  5. Lockout/Tagout Mistakes to Check in Your Program8 min read · Updated 2026-09-09
  6. Maximize Lockout/Tagout Safety: A Practical Playbook8 min read · Updated 2026-09-09
04 · Topic

Machines & stored energy

Energy that outlives the disconnect: stored energy, assessments, and automated equipment.

3 articles
  1. Stored Energy in LOTO: Release and Verification8 min read · Updated 2026-09-09
  2. LOTO Energy Assessment: Find Every Isolation Point8 min read · Updated 2026-09-09
  3. LOTO for Automated Equipment: Robots, VFDs, and Servos8 min read · Updated 2026-09-09
05 · Topic

Going digital

Moving the program from binders to the plant floor.

1 article
  1. LOTO Software vs. Excel Procedures: Benefits, Costs, and How to Switch9 min read · Updated 2026-09-16
06 · Topic

Software comparisons

Detailed, sourced evaluations of LOTO software and procedure services, and where Tegis fits.

2 articles
  1. Lockout Tagout Software Buyer’s Guide (2026): Requirements, Features, Pricing Models, and a 3-Year Cost Model20 min read · Updated 2026-10-19
  2. How to Choose a Lockout/Tagout Consultant (and What It Costs)7 min read · Updated 2026-10-26
New to lockout/tagout?Start here

Ready to put these articles to work?Create equipment procedures, link QR codes, and export PDFs in Tegis Safety.

Request a demo