Lockout/Tagout Compliance Checklist (Program, Procedure, Field)

This lockout/tagout compliance checklist covers four levels: the written program, the machine-specific procedures, field execution, and the annual periodic inspection. Anything you cannot check off is a gap to close before an OSHA inspection or an incident finds it.

Program-level checklist

Confirm your foundation:

  • A written energy control program exists and matches reality
  • Every machine requiring LOTO is inventoried
  • Lockout devices are standardized, durable, and identifiable by color or shape
  • Tags use the same format and warning wording everywhere
  • Authorized, affected, and other employees are trained appropriately
  • Training records are current and retrievable
  • Shift-change, contractor, and group lockout rules are documented

Procedure-level checklist

For each machine-specific procedure, verify:

  • All energy sources are identified with type and magnitude
  • Every isolation point is named exactly (panel, breaker, valve, plug)
  • The lockout device for each point is specified
  • Stored and residual energy release steps are explicit
  • The procedure specifies the employer-approved method for verifying that energy-control measures are effective
  • Photos of isolation points are included
  • The procedure has been reviewed with the employees who use it
  • The procedure is accessible at the point of work

Field execution checklist

Every time work happens, confirm:

  • Affected employees were notified before shutdown
  • The machine was shut down using its normal stopping method
  • Every energy source was isolated and locked, not just the obvious one
  • Stored energy was released, blocked, or restrained
  • Zero energy was verified before hands went in
  • Each authorized employee is protected under the employer’s lockout or group lockout procedure
  • Devices are removed under 1910.147(e)(3) and the employer’s procedure, including the rule for when the applying employee is unavailable

Periodic-inspection checklist

At least annually, inspect each applicable procedure and confirm:

  • The inspector is an authorized employee other than the employee(s) utilizing the procedure being inspected
  • Deviations were identified and corrected
  • The certification names the equipment, date, employees, and inspector
  • For lockout, each authorized employee’s responsibilities were reviewed with the inspector
  • For tagout, authorized and affected employees’ responsibilities and tagout limitations were reviewed

What to do with unchecked items

A checklist full of red marks is only useful if it leads to action. Rank every gap by two questions: how severe is the exposure, and how soon will that equipment be serviced? The machines serviced most often, with the most energy sources, go first.

Close gaps in this order: machine-specific procedures for high-risk equipment, then stored-energy and verification steps, then the annual inspection trail, then training records. Track each item to closure with an owner and a date: an unchecked checklist with no follow-up is evidence of a problem, not a solution.

Frequently asked questions

How often should we run this checklist?

OSHA requires periodic inspection of each applicable energy-control procedure at least annually. A company may use quarterly internal sampling as an additional review, but the standard does not set a quarterly checklist schedule. Reassess affected procedures when equipment or procedures change and follow the applicable retraining triggers.

What should we fix first if everything fails?

Prioritize gaps by the hazards and servicing work involved. Confirm first whether the equipment is within the standard’s scope and whether any specific exception applies, then address the required procedure, training, device, and inspection controls.

Is there a printable OSHA checklist PDF?

OSHA does not publish a fill-in LOTO checklist PDF. It publishes the standard and enforcement guidance. This checklist is built for the field; print it or use a digital LOTO program to track the same items with due dates and owners.

Do I need a separate checklist for each machine?

The program, procedure, and field checklists apply per machine: run the procedure and field sections against every asset. The annual audit section is tracked per procedure too, since each one needs its own certified inspection. A single checklist format reused across machines keeps the review consistent.