Energy Control Procedures: What OSHA 1910.147(c)(4) Requires

An energy control procedure is OSHA’s term in 29 CFR 1910.147(c)(4) for what most plants call a LOTO procedure: the equipment-specific instructions employees follow to control hazardous energy during servicing and maintenance. It must clearly describe its scope, purpose, authorization, rules, techniques, and how employees verify that energy controls work.

This guide covers what (c)(4) requires, how a procedure fits into the broader program, and the narrow exception to documenting one for a particular machine.

Energy control procedure vs. energy control program

The two terms are not interchangeable, and the standard separates them. The energy control program (1910.147(c)(1)) is the employer’s overall system: the written policy, the training, the devices, the inspections, and the procedures themselves. An energy control procedure (1910.147(c)(4)) is one document inside that program, covering one machine or one group of identical machines.

A useful shorthand: the program is the binder, the procedures are the pages. OSHA cites employers for missing procedures far more often than for a missing program document, which is why the distinction matters in practice.

Energy control programEnergy control procedure
Citation1910.147(c)(1)1910.147(c)(4)
What it isThe employer’s overall written systemOne machine-specific document
ScopeWhole facilityOne machine or identical group
IncludesPolicy, training, devices, inspectionsShutdown, isolation, lock, verify steps

What 1910.147(c)(4) requires the procedure to contain

The standard lists the required content. OSHA’s Appendix A to 1910.147 expands it into a recommended format, and most defensible procedures follow both:

  • A statement of intended use: the scope and purpose of the procedure, and the equipment it covers
  • The specific steps to shut down, isolate, and secure the machine, in order
  • The steps for placing, removing, and transferring lockout/tagout devices, and who is responsible at each step
  • The requirements for testing the machine to verify the isolation actually worked
  • Machine-specific identification: equipment ID and location, and every energy source with type and magnitude

One procedure per machine, not one per plant

A generic notice such as "isolate all energy before service" does not provide the specific instructions required by 1910.147(c)(4). The employer’s procedure must identify the equipment and give the instructions needed for its actual energy sources, isolation points, devices, stored energy, and verification.

Do not assume one generic procedure is adequate for a group of machines. Have the employer’s qualified reviewers confirm the scope and applicability.

OSHA’s narrow exception in 1910.147(c)(4)(i) concerns whether a procedure must be documented for a particular machine. It applies only when all eight listed conditions are met.

Those conditions include a single readily identifiable energy source, no hazardous stored or reaccumulating energy, one lock under the authorized employee’s exclusive control, no added hazards, and no prior unexpected activation incident. If any condition is missing, the exception does not apply. See the procedure template for a documented procedure structure.

How to name the procedure

Section 1910.147 uses the term “energy control procedure.” Teams may also say “lockout/tagout procedure.” The standard does not require a particular label or keyword; the content and use of the procedure are what matter.

Who writes them, and how long it should take

Procedures are written by EHS staff, maintenance leads, or consultants, but they must be verified in the field. An energy control procedure written at a desk is a guess: breaker numbers get misremembered, a second pneumatic feed gets missed, an accumulator nobody mentioned quietly holds pressure.

A practical starting point is a site walkdown with employees who service the equipment. Identify and document the sources, isolation points, stored-energy controls, and procedure-specific verification. Use photos only when they can be taken safely. The employer must review the completed procedure against the actual equipment and applicable requirements.

Deficiencies inspectors cite most

Patterns repeat across inspections. Check your procedures against this list:

  • No machine-specific procedure at all: the most-cited LOTO violation
  • Generic procedures with no named isolation points or no magnitude values
  • Missing stored-energy release steps for accumulators, springs, capacitors, or suspended loads
  • No verification step, or a verification that checks only one energy source
  • Procedures that exist in an office but not at the point of work
  • No documented periodic inspection tying back to the procedure

Keeping procedures current

An energy control procedure is a living document, not a one-time deliverable. It needs updating when the machine, its energy sources, or its isolation points change, and it must be reviewed at least annually through the periodic inspection required by 1910.147(c)(6).

The failure mode is always the same: the equipment changes, the document does not, and the printed copy at the machine teaches the wrong isolation point with confidence. That is the gap procedure software closes: one current version per machine, reachable by a QR scan at the asset.

Frequently asked questions

Is an energy control procedure the same as a lockout/tagout procedure?

Yes. "Energy control procedure" is the term OSHA uses in 29 CFR 1910.147(c)(4); "lockout/tagout procedure" is the everyday name for the same machine-specific document. Using both terms in your program records helps inspectors find what they are looking for.

Do I need a written energy control program as well as procedures?

Yes. 1910.147(c)(1) requires the written program, and 1910.147(c)(4) requires documented procedures for the machines it covers. The program can be brief, but it must exist and match what actually happens on the floor.

How many energy control procedures do I need?

The employer needs a procedure for covered equipment unless the narrow documentation exception in 1910.147(c)(4)(i) applies. A document may cover multiple machines only when its specific instructions genuinely apply to each machine and clearly identify its scope; have qualified site reviewers confirm that before use.

Are energy control procedures required for cord-and-plug equipment?

Only if the exemption fails. Cord-and-plug equipment is exempt when unplugging fully removes the hazard and the plug stays under the servicing employee’s exclusive control. If someone else could reconnect it, or stored energy remains, a procedure is required.

Can a consultant write our energy control procedures?

Yes, and many plants start there when internal capacity is limited. The facility must still review, approve, and maintain the program, and the procedures should be built from a walkdown with the people who service the equipment, not from documents alone.