How to Write a Lockout/Tagout Procedure (Step-by-Step)

To write a lockout/tagout procedure, document the equipment, list every energy source with its isolation point and device, write the shutdown, isolation, stored-energy, and verification steps in order, then review it with the people who use it before publishing. OSHA 1910.147(c)(4) sets what the procedure must contain, and Appendix A is a non-mandatory example.

This guide organizes a draft for qualified site review; it does not provide an isolation procedure for any machine. Work along in the free online lockout/tagout procedure template and export a PDF, Word file, or Excel workbook.

Step 1: Document the equipment

Start with the basics: equipment name, model, location, and the area or room it sits in. Use the same naming your maintenance team uses on the floor so the procedure is easy to find when someone needs it. One procedure covers one machine or process: resist the urge to write "several similar conveyors" into one document.

Step 2: Identify every energy source

Walk the machine and list each applicable energy source, its type and magnitude, the related hazard, and the isolation point. Use equipment nameplates, drawings, manufacturer information, and a qualified site assessment for actual values. Consider stored energy such as accumulators, springs, capacitors, and suspended loads without copying example values from a guide.

Step 3: Identify isolation points and devices

For each energy source, identify the exact point where it can be isolated: the panel and breaker number, the disconnect switch tag, the valve tag, the blank flange location. Specify the lockout device used at each point: breaker lock, hasp, valve clamp, plug lock. The worker should never have to guess which switch is which.

Step 4: Write the sequence in order

Write the shutdown, isolation, device-application, stored-energy, verification, and return-to-service steps in the order required by the employer’s procedure. Use placeholders while drafting, such as “[verified isolation point]” and “[employer-approved action].” A qualified site reviewer must confirm every identifier and action against the actual equipment before the procedure is approved or used.

Step 5: Address stored and residual energy

Identify any stored or residual energy and document the control and verification method selected by the employer for that specific equipment. Do not copy a generic release method or timing into a procedure: qualified personnel must determine the method from the equipment, manufacturer information, and site assessment.

Step 6: Add photos and diagrams

A photo of the exact disconnect or valve removes ambiguity that text alone cannot. Photograph isolation points from the perspective of the worker standing at the machine, and annotate breaker and valve numbers. Procedures with photos are dramatically faster to follow under time pressure.

Step 7: Review with the people who use it

Have authorized employees who service the equipment review the procedure at the machine so they can identify incorrect labels, missing sources, and steps that do not match the work. Separately, OSHA requires periodic inspections of each energy-control procedure at least annually; lockout inspections include a review between the inspector and each authorized employee of that employee’s responsibilities under the procedure.

Step 8: Publish, deploy, and keep current

A procedure in a binder in an office is not available at the point of work. Publish it where technicians can reach it: printed at the machine, in a PDF, or behind a QR code attached to the equipment.

Update the procedure whenever the machine, its energy sources, or its isolation points change, and review it at least annually.

Worked example: a packaging conveyor

A worked procedure must be built from the actual machine, its energy sources, and the employer-approved isolation and verification methods. Do not copy generic equipment identifiers, pressure values, isolation steps, or tests from an online example into a site procedure.

For a real asset, have qualified site personnel and the authorized employees who perform the work walk down each energy source and isolation point, confirm the equipment-specific sequence, and approve the resulting procedure before use. This guide does not provide an executable procedure.

Frequently asked questions

What must every lockout/tagout procedure include?

1910.147(c)(4)(ii) requires the procedure to clearly and specifically outline its scope, purpose, authorization, rules, and techniques. It must include the intended use, specific shutdown, isolation, blocking and securing steps, device placement, removal and transfer steps with responsibility, and requirements for testing or verifying the effectiveness of controls. Appendix A is an example procedure, not the source of the requirement.

Can I use one generic procedure for all machines?

The standard does not provide a general exception for a “generic procedure.” Its documentation exception applies only when all eight conditions in 1910.147(c)(4)(i) are met for the particular machine. The employer must assess the equipment; if any condition is absent, the exception is unavailable.

How often should a lockout/tagout procedure be updated?

Whenever the equipment or its energy sources change, after an audit finds a deviation, and at minimum once per year through the required periodic inspection.

Who should author the procedures?

A collaboration: safety or engineering staff structure the document, but the authorized employees who actually service the machine must verify the steps at the equipment. Procedures written without floor input routinely contain wrong isolation points.

How long should a lockout/tagout procedure be?

As long as the machine requires, no shorter. A simple single-energy machine may need a single page; a multi-energy machine with stored energy needs enough detail to name every isolation point, device, and verification. Length follows specificity: a procedure that is too short to name the actual disconnects and valves is too short, period. See the procedure template for the full structure.