Write machine-specific LOTO procedures in minutes, not days

Guided fields catch every energy source, isolation point, and verification step, so your procedures are complete the first time. Start from a template or a sister machine, then publish to a QR code.

  • No blank pages
  • Photos built in
  • Copy sister machines

Why write procedures in Tegis

Every procedure follows the same format

Guided fields mean every author answers the same questions, so reviewers can see what is missing.

Isolation points are easy to find

Breaker numbers, valve locations, and photos sit on the step that uses them, not in someone’s head or a separate folder.

Edits reach the floor right away

Update the procedure once. The QR code opens the current version, and the PDF regenerates from it.

From blank page to published procedure

Add the asset

Create the procedure under the right company and site with equipment ID, location, and energy summary.

Write the isolation steps

Add each energy source with its isolation point, lockout device, and verification step, plus photos and energy details.

Publish and tag

Link the QR code, place it on the asset, and export the PDF for training and records.

Rewrite one existing procedure in Tegis.

Write your first procedure

Common questions

What should a machine-specific LOTO procedure include?

Under OSHA 1910.147(c)(4): the scope and purpose, shutdown steps, isolation of every energy source, lockout/tagout device placement, stored-energy release, verification of isolation, and return-to-service steps, with the machine, location, and energy details identified. Tegis has a field for each.

Can we use our existing procedure template?

Yes. Your current template fields map into the Tegis structure, so you keep your language and add photos, QR linking, and consistent PDFs.

Who should write the procedures?

Usually EHS staff or maintenance leads who know the equipment, sometimes with a consultant for the first batch. Your organization controls who can write and approve.

How do updates work?

Edit the procedure once. The QR link serves the current version and you can regenerate the PDF. No reprinting whole binders.

Can contractors access procedures?

Yes. Share the QR-linked procedure or PDF with outside personnel as part of the contractor briefing required by 1910.147(f)(2).