Group lockout/tagout protects several authorized employees on the same equipment by giving each of them protection equivalent to individual lockout, with one authorized employee holding primary responsibility. OSHA sets the requirements in 1910.147(f)(3).
A group lockbox is one common method. The right method depends on the equipment and work, and this guide does not replace the employer’s written procedure or training.
When group lockout applies
When group lockout or tagout is used, the employer must follow the group requirements in 1910.147(f)(3). The method must account for the authorized employees involved, their individual protection, the primary authorized employee’s responsibilities, and any shift or personnel changes.
Document the group method in the energy-control program and train employees on their roles. Coordinate outside employers under 1910.147(f)(2) when contractors are involved.
The primary authorized employee: the coordinator role
The group method designates a primary authorized employee with overall responsibility for a number of employees working under the group device. That employee must account for each authorized employee’s exposure status and verify each employee’s identity as required by 1910.147(f)(3). The group arrangement does not remove each employee’s individual protection.
The employer should assign a person trained and authorized for the equipment and group method. Follow the site procedure for isolation, verification, communication, and return to service.
The group lockbox method, step by step
A group lockbox is one common method. Under the employer’s written procedure, a typical arrangement is:
- Authorized employees isolate the equipment and apply devices under the machine-specific procedure.
- For this example method, keys to equipment locks are secured inside the group lockbox.
- Each authorized employee applies their personal lock or tag to the group device before beginning work, as specified by the employer’s procedure.
- Employees follow the procedure for confirming their protection and communicating status to the primary authorized employee.
- When an employee stops working under the group method, that employee removes their own device as directed by the procedure.
- The primary authorized employee follows the employer’s return-to-service process only after the group device indicates no employee remains under its protection and the required checks are complete.
Each employee’s protection in the group method
The group procedure must ensure that each authorized employee receives the protection required by 1910.147(f)(3). In a lockbox method, each employee places and removes their own personal device on the group device according to the procedure. A supervisor’s device alone should not be assumed to protect other employees.
Device removal follows 1910.147(e)(3): the employee who applied it removes it unless the employer’s documented, trained procedure for an unavailable employee is used. Hasps and lockboxes are possible methods; choose one that meets the employer’s program and the job conditions.
Shift changes and personnel turnover mid-job
The employer’s procedure must address orderly transfer of lockout or tagout protection during shift or personnel changes under 1910.147(f)(4). An overlap of incoming and outgoing employees’ devices is one method; the employer’s procedure must define the actual transfer.
Follow the procedure for communication and transfer of primary-employee responsibilities when that role changes. Keep any records required by the employer’s program.
Group-method questions to review
Review the written group procedure and confirm it addresses the conditions at your site:
- The method does not identify each authorized employee working under the group device or preserve their individual protection.
- The method does not assign and train the primary authorized employee required for the group arrangement.
- Contractors and other employers are not coordinated under the applicable energy-control process.
- Shift or personnel changes are not covered by a procedure that maintains continuity of protection.
- The return-to-service process does not confirm the group is clear and devices are removed as required.
- Employees have not been trained on the group method used at the site.
Frequently asked questions
Can one lock cover an entire crew during servicing?
The group method must protect each authorized employee under 1910.147(f)(3). In a common lockbox arrangement, each employee applies a personal device to the group device. Follow the employer’s procedure for the actual method; do not assume one supervisor’s lock alone provides the required protection.
What does the primary authorized employee actually do?
The primary authorized employee has overall responsibility for the employees working under the group device. Follow 1910.147(f)(3) and the employer’s procedure for isolation, communication, accountability, and return to service. The primary role does not remove each employee’s required protection.
Do contractors join the group lockbox or run their own lockout?
The host employer and outside employer must inform each other of their respective energy-control procedures under 1910.147(f)(2). The contractor’s employees must follow the agreed procedure and maintain the protection required by the standard. A group lockbox is one possible method.
Hasp or lockbox: which should we use?
A hasp or group lockbox may be part of an employer’s group method. Choose based on the number of isolation points, employees, and work conditions, and confirm the method meets 1910.147(f)(3). OSHA does not designate one of these devices as the universal method.
Can the primary employee also do hands-on work?
The primary employee must also follow the group procedure for any work they perform under the group device. The coordination role does not replace the protection required for that employee as an authorized employee.