Help topic

Procedures and Steps

Detailed guidance for building procedures, setting IDs, attaching photos, linking common steps, and understanding flagged items.

Creating a procedure record

Each procedure starts with the equipment name plus optional identifying details such as a custom ID, location, and description. The custom ID can be typed manually or scanned from an existing plant barcode. This is useful when you want Tegis Safety to match your asset register, CMMS, or equipment tag system.

Examples

  • Name: Conveyor 14 Infeed
  • Custom ID: CV-14-IN
  • Location: Packaging Hall, Row D

Moving from header details into steps

After the main details are saved, the workflow continues into the steps table. This is where each isolation point is captured. A good procedure lists every energy source, the lockout device, the exact location, the isolation action, and how to verify a zero-energy state.

Tips

  • Use the same terminology operators use at the machine.
  • Keep verification instructions observable and testable.
  • Add a photo whenever the isolation point is not obvious to a new employee.

What a single step contains

A step can include the energy type, energy level, location, isolation device, procedure text, verification text, and a source photo. For unusual equipment, custom isolation-device text can also be entered by choosing the Other option.

Using step linking correctly

If multiple procedures use the same upstream disconnect or shared isolation point, link the existing step instead of duplicating it. Linked steps keep procedures consistent and allow downstream PDF regeneration when shared information changes.

Flagged procedures and QR pin states

Flagging highlights a procedure visually so reviewers can find it quickly. In list views, linked procedures also show their QR link status and a pin value when available. If a procedure shows Not linked, it still exists but has not yet been connected to a QR sticker.

Isolation device selection guide

The isolation-device field records the device identified by your employer’s equipment assessment and site procedure. Tegis labels are reference choices; they do not determine whether a device is compatible or provide a safe isolation method. Confirm the actual energy-isolating device, device compatibility, and group-protection method with the employer’s authorized procedure and qualified site personnel. If no listed label fits, use Other to describe the selected device.

Tips

  • Choose a label that describes the device specified by the site procedure.
  • For group servicing, follow the employer’s documented group lockout method so each exposed authorized employee receives required protection.
Learning resources

Lockout/Tagout Safety Articles

Educational articles about hazardous energy control and OSHA 1910.147 compliance, separate from the platform instructions above. No account needed.

Browse all safety articles →